Installation and Relocation¶
This chapter describes how to prepare your lab for Opentrons Flex, how to set up the robot, and how to move it if necessary.
- Before taking delivery of your Flex, make sure that your lab or facility meets all the criteria in the Installation Requirements section.
- When it's time to get your Flex up and running, follow the detailed instructions in the Unboxing, First Run, and Instrument Installation and Calibration sections, or use the Opentrons On-Site Installation service.
- If you ever need to move your Flex to a new location, near or far, follow the steps in the Relocation section.